| OPTICAL NETWORKS |
| Case Study |
|
 |
|
| |
| Development of Triple play capability
in an APON OLT |
| |
 |
| |
| The client |
| A leading provider
of access equipment. |
| |
| Challenge |
 |
Business:
The client had chosen a very aggressive development
plan for the product, so as to gain the time-to-market
advantage. This meant that the new team had
very little time to ramp-up. |
 |
Technical:
The customer has stringent norms for product
quality |
To be able to ramp-up quickly and deliver features
of high quality within the aggressive development
schedule, the design vendor was expected to have
a ready pool of engineers with previous development
experience in the Access domain. |
| |
| Solution |
 |
Wipro was the
right fit for the client’s requirements |
 |
The Wipro
team augmented the client’s development
team, to help deliver the product within the
planned timelines |
 |
Wipro developed following
features for the OLT
 |
Enhancing
ATM module to provide per ONT traffic
controls |
 |
Porting
the BSP and platform-specific modules
from pSOS+ to VxWorks, on the network
and line termination cards |
 |
Porting the OMCI
protocol to the new platform |
 |
Additional TL1 based
craft commands |
 |
Optimization of
ONT provisioning and ATM initialization |
 |
Dynamic PON bandwidth
allocation for subscribed ONTs |
 |
Equipment management
functionality |
|
 |
Wipro team took ownership
of integrating the features developed by them,
with the existing product software |
 |
Wipro team performed a
rigorous system integration testing cycle,
to ensure that the Clients quality norms were
met |
 |
The first product release
was done by the Wipro team working from the
client location, and subsequently the operations
were moved to Wipro’s offshore location |
|
| |
| Benefits |
 |
Wipro team’s
PON area expertise resulted in quick ramp-ups
and a higher productivity, thereby helping
the client meet the challenging deadlines |
 |
The flexible
staffing advantage provided by Wipro resulted
in lower net R&D expenditure for the client |
 |
The client enjoys continual
cost benefits as enhancements and maintenance
activities to the product are carried out
from the offshore development location |
|
| |
|
| |
|
|